Thank you for your interest in the North Bethany Bicycle and Pedestrian Corridor Study. After attending the Workshop on June 3, 2025, please take the below survey to share your feedback. A  recording and PDF of the presentation is also available for your reference on the June ’25 Workshop tab.

Question title

1. What is your relationship to the SR 1 corridor (between Bethany Beach and the Indian River Inlet Bridge). Please select all that apply.

Click to view results

Question title

2. How often do you use the following modes of transportation to travel along the corridor?

Loading question...

Question title

3. A crosswalk with Rectangular Rapid Flashing Beacons (RRFBs) is scheduled to be installed at Location 2 – Heron Road as part of short-term improvements. Two design options are shown below. See slides 35-36 of the presentation for more details. Please indicate your preference.

3. A crosswalk with Rectangular Rapid Flashing Beacons (RRFBs) is scheduled to be installed at Location 2 Heron Road as part of short-term improvements. Two design options are shown below. See slides 35-36 of the presentation for more details. Please indicate your preference.
Click to view results

Question title

4. A crosswalk with Rectangular Rapid Flashing Beacons (RRFBs) is scheduled to be installed at Location 3 – Indian Harbor Villas/Beach Cove Square as part of short-term improvements. Two design options are shown below. See slides 37-38 of the presentation for more details. Please indicate your preference by selecting one of the following:

4. A crosswalk with Rectangular Rapid Flashing Beacons (RRFBs) is scheduled to be installed at Location 3 Indian Harbor Villas/Beach Cove Square as part of short-term improvements. Two design options are shown below. See slides 37-38 of the presentation for more details. Please indicate your preference by selecting one of the following:
Click to view results

Question title

5. As part of the implementation of the State Highway Safety Plan, DelDOT is conducting a systematic review of median crossovers along the SR 1 corridor from Dewey to the DE/MD state line. The goal is to identify opportunities for movement closures at crossover locations to reduce conflict points and increase safety. Are you supportive of the crossover modifications and closures between the Indian River Inlet Bridge and Bethany Beach described in the presentation? See slides 31-34 of the presentation for more details.

Click to view results

Question title

6. Do you have any feedback on the mid-term recommendation to provide a larger striped buffer between motor vehicle traffic and the dedicated bicycle and pedestrian space in the shoulder? See slides 41-44 of the presentation for more details.

Question title

7. Do you have any feedback on the long-term recommendation to provide shared use paths with grass buffer and guardrail? See slides 46-48 of the presentation for more details.

Question title

8. Do you have any other feedback on the North Bethany Bicycle and Pedestrian Corridor Study?

Question title

Would you like to receive study updates? If so, please provide your name and email.

Project Contact Information

Email: [email protected]

live
live
Report Development

Spring 2025

complete
complete
Public Workshop #2 - Present Refined Alternatives

Tuesday, June 3, 2025, 5pm-7-m

South Coastal Library

43 Kent Avenue, Bethany Beach DE 19930

complete
complete
Refine Preferred Alternatives

Late 2024-Early 2025

complete
complete
Online Question and Answer Session

Monday, May 20, 5:00pm - 6:30pm

complete
complete
Public Workshop #1 - Alternatives Review

Wednesday, May 8, 2024, 5pm - 7pm

South Coastal Library

43 Kent Avenue, Bethany Beach, DE 19930

complete
complete
Alternatives development

Winter-Spring 2024

complete
complete
Existing conditions assessment

Fall-Winter 2023